On this page we have listed a selection of our references from the chemical, pharmaceutical and sterile plant sectors. Please do not hesitate to contact us if you have any questions. We can provide you with further references on request.
2022
Our client is an international pharmaceutical company with headquarters in Basel and production facilities in Valais but also abroad. The business model of this customer is based on supporting the products of emerging biotech companies as quickly as possible and under cGMP conditions for clinical testing as well as market introduction.
Any biotech production requires very pure water, which is regulated by the respective pharmacopoeias. The best known is that of the United States, which is controlled and monitored by the Food and Drug Administration (FDA). The most important qualities besides drinking water are Purified Water (PW) and Water for Injection (WFI), which are sometimes required in large quantities and above all in consistent quality.
Due to Apaco‘s experience in the field of ultrapure water (apparatus, equipment, piping and automation), we were initially contracted for a new WFI supply and shortly thereafter for a complete Purified Water and WFI supply.
2021
Die F. Hoffmann – La Roche AG in Basel plante und errichtete unter den Namen IVR 098 einen Neubau für die Forschung und Entwicklung. Der Neubau besteht aus sechs Ober- und vier Untergeschossen mit einer Fläche von 9.600 m².
2020
For a new biotechnological production at an innovative Swiss pharmaceutical company, a new steam boiler
heating system was required. The new steam boiler type
UL-S has a capacity of 5000 kg/h saturated steam. Through efficiency-enhancing additional modules, both energy costs and emissions are reduced.
2020
For a new biotechnological production at an innovative Swiss pharmaceutical company, a mobile pharmaceutical stirred tank was required. In addition to the stirring task, the vessel had to be cleanable on the inside by means of spray lances, and completely suitable for clean room operation (BioSafety Level 1) on the outside.
2015 – ongoing
Isometrics preparation, apparatus assembly, pipe prefabrication and assembly in stainless steel and special materials, Hastelloy C22, plastic PE-EL, PP, PPSEL and enamel, including documentation of materials and welding work.
2010 – ongoing
Construction of manufacturing facilities for sterile applications for tube prefabrication and assembly of ultrapure media, distribution including GMP-compliant documentation of welding work.
2017
WBI storage and distribution system, apparatus assembly, pipe prefabrication and assembly in stainless steel including GMP compliant documentation of materials and welding work.
2016
Apparatus assembly, pipe prefabrication and assembly in stainless steel and special materials including documentation of materials and welding work.